Question - Budget


Question

Number
619
Subject
Budget
(Weetangera Primary School )
Asked by
Cain, Peter
Directed to
Minister for Education and Early Childhood
Question asked on
18 September 2025
Answer due on
19 October 2025
Question asked
  1. What is the total budget allocated for the geothermal heating project at Weetangera Primary School, including how much has been spent to date.
  2. Has the project referred to in part (1) experienced cost overruns; if so, what is the revised budget.
  3. Has a cost-benefit analysis been conducted for the project referred to in part (1); if so, will it be made publicly available.
  4. Has the Government assessed whether the project referred to in part (1) represents proven economic infrastructure.
  5. What is the total timeframe for the project referred to in part (1), from commencement to completion.
  6. What is the estimated period before the project referred to in part (1) becomes energy positive, taking into account the energy consumed during drilling and construction, embedded energy in manufacturing and installing infrastructure, and the projected operational energy savings.
  7. What was the original project timeline and what is the expected revised completion date of the project referred to in part (1).
  8. What delays have been encountered to date, including those caused by geological issues, and how have these affected costs and schedule.
  9. What measures have been implemented to minimise disruption to classroom learning and nearby residents caused by drilling noise and construction.
  10. What arrangements have been made to address the temporary loss of playground space during construction.
  11. How will the performance and cost-effectiveness of the geothermal system be evaluated once operational.
  12. How many other schools are planned for similar geothermal or renewable heating conversions, and what is the projected cost of those programs.

Answer

Answer Published
20 October 2025
Answered by
Minister for Education and Early Childhood
Answer

QON—Please see attached PDF for a copy of the answer to question on notice No 619.

Attachments