Question asked
  1. Has Evo Energy conducted a site survey to assess the current condition of the pole at 36 Levien Street, Scullin.
  2. Has the pole at 36 Levien Street, Scullin been assessed for safety risks or potential hazards to the surrounding area.
  3. Are there any ongoing maintenance or repair plans for the pole at 36 Levien Street, Scullin.
  4. Has Evo Energy considered relocating the pole at 36 Levien Street, Scullin to a different location.
  5. What consultations or community engagement have been done in relation to the placement or condition of the pole at 36 Levien Street, Scullin.
  6. How does Evo Energy define the threshold for considering a pole "unsafe" or "serviceable".

Answer

Answer Published
16 April 2025
Answered by
Minister for Finance
Answer

Please see attached PDF for a copy of the answer to question on notice No 178.