Question
(Active panels)
- Can the Minister outline which active panels originate from the Transport Canberra and City Services Directorate.
- For each of the active panels referred to in part (1), can the Minister outline what suppliers are currently listed under each panel.
- For each of the active panels referred to in part (1), can the Minister outline when the panel was last refreshed or reconsidered.
- Can the Minister advise the rate of variability for suppliers year-by-year for each active panel, e.g. what percent year-on-year does the supplier list for each active panel change/vary.
Answer
(1) Active Panel |
(2) Suppliers
| (3) Execution Date/Extended Date | Expiry Date | (4) Changes to Panel |
Urban Seasonal Tree Planting Services Panel
| Regal Innovations Pty Ltd TreeWorks (ACT/NSW) Pty Ltd Glascott Landscape and Civil Pty Ltd Copa Enterprises Pty Ltd T/A Dan and Dan The Outdoor People Pty Ltd | 23/11/2022
| 22-Nov-25
| Nil. No panel members have been added or removed from the panel since it was put in place.
|
Streetlight Asset Upgrade and General Maintenance Panel | Affinity Electrical Technologies
| 28/04/2022 Has not been refreshed or reconsidered. | 03-Feb-25
| Nil. Has not been refreshed or reconsidered. |
Civil Construction Panel
| Dale & Hitchcock Civil Pty Ltd Canberra Contractors Pty Ltd Complex Co. Pty Ltd Cord Civil Pty Ltd Leed Engineering and Construction Pty Ltd Woden Contractors Pty Limited Guideline ACT Pty Ltd | 26/03/2022
| 30-May-25
| Nil.
|
Urban Tree Removal Services Panel
| Asplundh Tree Expert (Australia Pty Ltd T/A Summit Open Space Services McMahon's Earthmoving Pty Ltd T/A McMahon's Tree Service Active Tree Services Pty Ltd | 07/03/2022
| 30-Jun-25
| Nil. |
Landscape Material Supply Panel-Sports Grounds and Urban Spaces
| Paragalli Haulage
| 28/02/2022
| 28-Feb-25
| One panel member requested to be removed from the panel. This was facilitated in 2022. |
Seed Supply Panel – Sports Grounds and Urban Spaces
| Gilba Solutions Pty Ltd Greenway Turf Solutions Amgrow Australia Pty Ltd Greenshed Pty Ltd | 17/12/2021
| 17-Dec-25
| Nil. |
Road and Path Maintenance Under a Panel Arrangement
| Capital Asphalt Downer EDI Works Pty Ltd JSC Pty Ltd JSK Excavations Pty Ltd Paraco Projects Pty Ltd Patches Asphalt Wellbuilt Construction and formwork | 15/11/2021
| 15-Nov-23
| Nil. |
Tree Surgery Plant Equipment
| Sapphire Coast Tree Service Eric James Barber T/A Canscape Asplundh Tree Expert (Australia) Pty Ltd | 02/11/2021
| 31-Oct-24
| Nil. No panel members have been added or removed from the panel since it was put in place. |
Plant and Equipment Wet Hire
| Bingley Electrical Excavations Burgess Horticultural Services (BURHOR) Capital Asphalt CEHH PTY LTD Complex Co. Pty Ltd Cord Civil Pty Ltd D Group Pty Ltd Downer EDI Works Pty Ltd Flexible Australia Total Drain Cleaning Services Pty Ltd | 22/04/2021
| 30-Apr-23
| Nil. All Suppliers have agreed to the extension. No new suppliers considered.
|
Supply of Asphaltic Concrete Panel
| Boral Asphalt - Preferred Supplier Capital Asphalt - Second Preferred Downer EDI Works Pty Ltd - Third Preferred | 22/03/2021 The offer to extend the panel deed by 12 months was accepted by all suppliers in accordance with the extension option available. | 21-Mar-24
| Nil. All three suppliers agreed to stay to end of current contract (March 2024). |
Pavement Marking Maintenance Under a Panel Arrangement
| Locktons Traffic Solutions Supalux Pty Ltd | 19/01/2021 Procurement process currently in progress to refresh the panel. Procurement is expected to be finalised mid-2023. | 31-Dec-24
| Nil |
Panel of Providers for Tree Watering Trucks and Other Related Services
| Develin Engineering (expired)
| 01/11/2019
| 13-Nov-23
| Four panel members were initially signed to the panel. The agreement with one panel member expired in 2022. Another panel member was not offered an extension to their contract. |
Sportsgrounds Floodlighting Maintenance
| Ecowise Services
| 14/12/2018 Established in 2018, with term extensions till Oct 2023. | 31-Oct-23
| Nil. |
Segmental Paving Remediation Panel
| Paraco Projects
| 25/08/2022 This panel was established in Sept 2022. Refresh will be considered in 2023. | 31-Jul-24
| Nil. |
Plant and Equipment Dry Hire Panel
| Coates Hire Operations Conplant Pty Ltd TFH Hire Porter Excavations Pty Ltd | 14/12/2022 Refresh will be considered in 2024. | 10-Dec-25
| Nil. |
Panel for Provision of Arterial Road Dry-land Grass Mowing Services for Central and South Canberra | Canberra Mowing Skyline Landscape Services ACT Burgess Horticultural Services (BURHOR) | 30/03/2021 The offer to extend the panel deed by 12 months was accepted by all suppliers in accordance with the extension option available. | 31-Mar-24
| Nil. |
(4) TCCS Panels do not have a rate of variability as we do not add suppliers to our panels. Changes to panel arrangement where a supplier has been removed from the panel is listed in the table above.