Question
(cyclepaths)
(1) What was the (a) projected cost and (b) actual cost of building the recently completed Belconnen Bikeway
(2) What was the cost broken down by (a) actual bikeway, (b) associated infrastructure and (c) landscaping for each segment of (a) Florey to the nearest end of the old Belconnen Busway, (b) the length of the old Belconnen Busway, (c) the end of the old Belconnen Busway to Aikman Drive and (d) Aikman Drive to Haydon Drive.
(3) What is the length of each segment referred to in part (2).
(4) What is the length of the stone wall built as part of the Belconnen Bikeway between Aikman and Haydon Drives.
(5) What was the complete cost of building this stone wall.
Answer
Please see attached PDF for answer to question on notice No 57.