Question
Number
1285
Subject
Suburban Land Agency
(consultancy services)
(consultancy services)
Asked by
Cain, Peter
Directed to
Minister for Housing and Suburban Development
Question asked on
06 June 2023
Answer due on
09 July 2023
Question asked
Can the Minister provide the (a) name of the supplier and the contract name for each contract and (b) original and current amount for each contract, for all current and completed contracts for consultancy services for the Suburban Land Agency, for each financial year from 2018-2019 to 2022-23 inclusive.
Answer
Answer Published
28 June 2023
Answered by
Minister for Housing and Suburban Development
Answer
Contractor Name | Contract Title | Original Amount | Current Amount | Execution Date | Expiry Date |
Deloitte Financial Advisory Pty Ltd | Molonglo Valley Stage 3 - 132kV Relocation Business Case | $25,000.00 | $25,000.00 | 29-Aug-18 | 31-Oct-18 |
Calibre Professional Services (ACT) Pty Ltd | Whitlam Stages 3 and 4 - Engineering Consultancy | $1,890,735.00 | $3,810,631.00 | 23-Aug-18 | 23-Aug-23 |
MMJ Real Estate | Braddon Section 60 Block 4 & Turner Section 68 Block 1 Tender Valuations 2 of 2 | $27,300.00 | $27,300.00 | 07-Aug-18 | 28-Jun-19 |
Australian Dams & Water Consultants Pty Ltd | Deep Creek Regional Water Quality Pond - Peer Review | $102,840.00 | $102,840.00 | 10-Oct-18 | 31-Dec-24 |
Donald Cant Watts Corke (ACT) Pty Ltd | Kingston Arts Precinct - Cost Plan Review and Advisory Services | $30,965.00 | $30,965.00 | 08-Oct-18 | 31-Mar-19 |
Senversa Pty Ltd | Kingston Arts Precinct - Environmental Advisory Services | $40,500.00 | $40,500.00 | 31-Oct-18 | 31-Mar-19 |
Philip Leeson Architects | Horse Park Conservation Management Plan | $65,024.85 | $65,024.85 | 20-Nov-18 | 20-Nov-19 |
Company Matters Pty Limited | Company Matters Pty Ltd | $125,000.00 | $125,000.00 | 04-Jul-18 | 14-Sep-18 |
Jacinta Maree Cubis | Kingston Arts Precinct - Stakeholder Engagement | $97,383.00 | $97,383.00 | 13-Nov-18 | 31-Mar-19 |
Spiire Australia Pty Ltd | Greenway S28 - Superintendence of footpaths and associated works | $44,803.00 | $44,803.00 | 03-Jan-19 | 01-Mar-20 |
Canberra Town Planning | Furzer Street Subdivision Early Planning | $55,776.60 | $55,776.60 | 10-Jan-19 | 16-Mar-19 |
Hudson Global Resources (Aust) Pty Ltd | Recruitment Services | $79,000.00 | $79,000.00 | 16-Nov-18 | 17-Mar-19 |
Whereto Research | SLA Market Research Project | $59,999.50 | $144,058.40 | 10-Jan-19 | 30-Jun-19 |
Indesco Pty Ltd | Block 17 Section 152 Belconnen - Site Investigation Report | $33,000.00 | $33,000.00 | 07-Nov-18 | 29-Mar-19 |
Redbox Design Group Pty Ltd | Coombs 3A Edgeworth Parade Playground Design Consultation | $250,076.00 | $395,609.40 | 13-Feb-19 | 31-Dec-22 |
Spiire Australia Pty Ltd | Hume West Stage 2B - Design and Superintendency | $227,557.00 | $227,557.00 | 21-Sep-18 | 30-Jun-20 |
SMH Civil Engineering Pty Ltd | Project Director - Infrastructure Services | $190,000.00 | $190,000.00 | 18-Feb-19 | 18-Feb-20 |
Black Mountain Construction Assurance | Wright 1A Rectification and Associated Works Superintendency | $91,230.00 | $91,230.00 | 26-Oct-18 | 26-Oct-19 |
Dawkins Planning, Development and Project Management Pty Limited | Whitlam Display Village | $77,250.00 | $77,250.00 | 08-Apr-19 | 30-Jun-19 |
AECOM Australia | Whitlam Residential Estate Stage 1 Construction Services Consultancy | $2,297,289.00 | $2,297,289.00 | 06-May-19 | 14-Dec-20 |
PricewaterhouseCoopers (ABN: 52 780 433 757) | Alternate Dispute Resolution | $104,500.00 | $104,500.00 | 14-Sep-18 | 14-Sep-19 |
CHMA Pty Limited | Jacka 2 - Archaeological Investigations | $73,660.00 | $73,660.00 | 08-Mar-19 | 30-Jun-19 |
Ashurst | Provision of Legal Services on GST implications | $190,000.00 | $190,000.00 | 13-May-19 | 30-Nov-19 |
Manuka Realty Pty Ltd | Kingston Arts Precinct - Valuation Advisory Services | $24,500.00 | $29,750.00 | 08-Oct-18 | 30-Jun-19 |
Gunning Ag & Water Solutions | Huntly - Mainline Water Infrastructure Upgrades | $123,012.89 | $123,702.89 | 11-Jan-19 | 30-Jun-19 |
Indesco Pty Ltd | Coombs 3a Pedestrian Network and Open Space - Stage 2 Superintendency | $224,980.00 | $224,980.00 | 25-Apr-19 | 25-Apr-21 |
Newman Engineering Pty Ltd | Independant Certification of Whitlam Estate Dam P3 | $67,694.00 | $67,694.00 | 20-May-19 | 20-May-21 |
KPMG | Commercial Advisory - Ginninderry Joint Venture | $184,140.00 | $184,140.00 | 23-May-19 | 22-May-20 |
NBN Co Limited | Whitlam Stage 2 Telecommunications Infrastructure | $272,200.00 | $272,200.00 | 07-Jun-19 | 07-Jun-21 |
AECOM Australia | Critical Infrastructure Projects - Business Case Review | $25,000.00 | $25,000.00 | 09-Sep-19 | 30-Nov-19 |
Redbox Design Group Pty Ltd | Throsby Entry Experience | $38,423.00 | $38,423.00 | 17-Sep-19 | 25-Dec-20 |
Indesco Pty Ltd | Throsby Delta Clean Up | $40,214.35 | $40,214.35 | 16-Oct-19 | 20-Dec-19 |
Whereto Research | SLA Market Research Project | $29,218.75 | $29,218.75 | 01-May-19 | 01-May-21 |
KPMG | West Belconnen Joint Venture Sales and GST Process | $21,950.00 | $64,300.00 | 07-Jan-19 | 30-Jun-19 |
CIVAS (ACT) Pty Ltd | Property Market Advice-Multiple ACT Town Centres and Districts | $64,790.00 | $64,790.00 | 07-Aug-19 | 30-Sep-19 |
Belconnen Community Service | Community Development Officer - Moncrieff and Taylor | $60,000.00 | $60,000.00 | 01-Oct-19 | 30-Apr-20 |
AECOM Australia | Traffic Input Assessment, Belconnen Section 152 Development & Phillip Phillip Sec 180 Furzer Street | $178,717.00 | $178,717.00 | 13-Sep-19 | 11-Sep-20 |
Callida Consulting | Planning Framework | $162,030.00 | $251,966.00 | 29-Aug-18 | 30-Jun-19 |
Cardno (NSW/ACT) Pty Ltd | Coombs Peninsula Planning and Engineering Consultancy | $409,300.00 | $447,318.90 | 19-Sep-19 | 19-Sep-21 |
SMEC Australia | Deep Creek Water Quality Control Pond Review | $47,843.40 | $47,843.40 | 13-Nov-19 | 31-Dec-19 |
Redbox Design Group Pty Ltd | Whitlam Collaboration Hub - Landscape Design | $28,380.00 | $28,380.00 | 27-Nov-19 | 30-Apr-20 |
Deloitte Financial Advisory | GJV - Refinancing Business Case | $56,237.28 | $56,237.28 | 21-Feb-19 | 30-Jun-19 |
Cardno | Gungahlin Town Centre East Roads B2 S30 - Temporary Gravel Capark | $20,416.00 | $25,635.50 | 21-Dec-19 | 30-Jun-20 |
SGS Economics and Planning Pty Ltd | Affordable and Community Housing Rental Advice Report | $50,941.00 | $50,941.00 | 18-Mar-20 | 21-Feb-21 |
PLACE Laboratory | Whitlam Place Making | $149,127.00 | $149,127.00 | 25-Mar-20 | 30-Jun-21 |
Indesco Pty Ltd | Taylor 3 Residential Estate Construction Services Engineering Consultancy Principal Appointed Delegate | $1,840,051.00 | $1,840,051.00 | 07-Aug-20 | 07-Aug-21 |
Calibre Professional Services pty ltd | Whitlam Stage 2 Construction Services Engineering Consultancy Principal Authorised Delegate under GC21 | $1,663,648.00 | $1,663,648.00 | 02-Apr-20 | 02-Dec-22 |
King & Wood Mallesons | Legal Advice Services – Canberra Brickworks – GST Treatment | $20,000.00 | $46,976.40 | 14-Jun-19 | 20-Dec-19 |
Indesco Pty Ltd | Taylor 2 Stage 2C & 4C Landscape Construction Management and Superintendency | $343,635.00 | $343,635.00 | 13-May-20 | 13-May-21 |
SMEC Australia | MVIS Odour Mitigation Project - Tender and Construction Phase Services | $701,700.00 | $1,152,726.29 | 07-Jul-20 | 30-Jun-23 |
GHD Pty Ltd | Molonglo Critical Infrastructure Project - Deep Creek Water Quality Control Pond Detailed Design | $2,150,286.00 | $4,328,210.70 | 29-Jul-20 | 28-Jul-24 |
The Communication Link | Suburban Land Agency Mingle Program Review | $40,370.00 | $40,370.00 | 05-Aug-20 | 31-Oct-20 |
Douglas Partners Pty Ltd | MVIS Odour Mitigation - Preliminary Geotechnical Advice | $32,934.00 | $52,955.76 | 07-Jul-20 | 19-Jul-21 |
Indesco Pty Ltd | Taylor Display Suite Landscape Superintendency Services | $16,126.00 | $25,146.00 | 01-Sep-20 | 01-Jan-21 |
AQ Planning | Strategic Analysis for Rural Land Management | $26,070.00 | $26,070.00 | 04-Aug-20 | 04-Nov-20 |
AECOM Australia Pty Ltd | Water Quality Peer Reviewer | $44,946.00 | $44,946.00 | 16-Nov-20 | 16-Nov-22 |
Formswell Design | 3D Visualisations of the Whitlam Collaboration Hub and Display Village | $65,780.00 | $65,780.00 | 08-Dec-20 | 30-Jun-21 |
PLACE Laboratory | Belconnen Town Centre Precincts Place Planning | $132,528.00 | $146,316.50 | 16-Nov-20 | 18-Mar-21 |
DPM CONFERENCING PTY LTD | Molonglo Valley sites x4 community engagement | $33,500.00 | $33,500.00 | 25-Feb-21 | 01-Apr-21 |
Colliers International | Parkwood Valuations | $26,015.00 | $26,015.00 | 02-Mar-21 | 30-Jun-21 |
CBRE | Parkwood Road Valuations | $27,060.00 | $27,060.00 | 02-Mar-21 | 30-Jun-21 |
Insync | Suburban Land Agency Board Evaluation 2020 | $24,700.01 | $24,700.01 | 01-Dec-20 | 30-Jun-21 |
Lockbridge Pty Ltd | Block 2 Section 57 Turner Development Options Study | $123,310.00 | $123,310.00 | 08-Apr-21 | 31-Jul-21 |
Umwelt (Australia) Pty Limited | Yarralumla Equestrian Park Offset Management Plan Monitoring and Reporting | $88,270.20 | $88,270.20 | 11-Mar-21 | 30-Apr-25 |
BES (Aust) Pty Ltd | Molonglo 132 kV Project Provision of Technical Assistance | $32,175.00 | $32,175.00 | 13-May-20 | 13-May-21 |
Arup | Advice on a Gas-Free Commercial Centre | $79,460.70 | $79,460.70 | 18-May-21 | 04-Aug-21 |
AECOM Australia Pty Ltd | Block 39 Section 52 Belconnen Detailed Site Investigation | $97,757.34 | $97,757.34 | 14-May-21 | 30-Nov-21 |
SMEC Australia | North Coombs Pond & Path - Superintendency | $87,691.00 | $87,691.00 | 01-Apr-21 | 30-Dec-22 |
Colliers International | Commercial Advice | $62,700.00 | $62,700.00 | 05-May-21 | 30-Jun-21 |
Spiire Australia Pty Ltd | GREENWAY OPEN SPACE AND BRIDGE DESIGN | $64,186.00 | $64,186.00 | 24-Mar-21 | 28-May-21 |
Spiire Australia Pty Ltd | John Gorton Drive Street Tree Upgrade - Superintendency | $104,610.00 | $104,610.00 | 07-May-21 | 01-Oct-21 |
Lanterra Consulting | Whitlam Stage 1 CEMP Compliance Audit | $31,350.00 | $31,350.00 | 05-May-21 | 21-Dec-21 |
Dawkins Planning, Development and Project Management Pty Limited | North Canberra Land Due Diligence | $59,400.00 | $69,400.00 | 23-Jul-21 | 31-Dec-23 |
Cardno (NSW/ACT) Pty Ltd | Coombs Edgeworth Parade Playground Superintendency | $235,118.80 | $235,118.80 | 04-Aug-21 | 31-Dec-22 |
Veris Australia Pty Ltd | Molonglo Commercial Centre - detailed survey | $129,910.00 | $129,910.00 | 06-Aug-21 | 01-Dec-21 |
JPS ENGINEERING CONSULTANTS | Denman Prospect Stage 3 Planning and Engineering Design Consultancy - detailed site investigation report | $168,221.90 | $168,221.90 | 05-Aug-21 | 31-Mar-22 |
Eco Logical Australia | Suburban Land Agency Bushfire Operational Plan | $113,590.00 | $113,590.00 | 02-Sep-21 | 28-Dec-23 |
Indesco Pty Ltd | Block 2 Section 57 Turner Planning and Engineering Consultancy | $249,733.00 | $249,733.00 | 10-Nov-21 | 09-May-23 |
HATCH ROBERTS DAY | Community and Stakeholder engagement services - Whitlam Local Centre | $64,900.00 | $64,900.00 | 08-Dec-21 | 25-May-22 |
The Communication Link | Engagement services for Kingston Arts Precinct | $148,709.00 | $148,709.00 | 14-Dec-21 | 14-Dec-22 |
Place Design Group Pty Ltd | Kingston Arts Precinct Place Brief | $93,087.50 | $93,087.50 | 13-Feb-22 | 13-Aug-22 |
Right Angle Communication Pty Ltd | Communications Content Development for 70% Infill Project | $38,989.50 | $38,989.50 | 22-Jan-22 | 31-Mar-22 |
Capital Works Consulting Pty Ltd | KAP - Strategic Project Management Services | $127,314.00 | $127,314.00 | 21-Feb-22 | 21-Jun-23 |
Tait Network | Urban Planning for North Canberra Land | $50,000.00 | $50,000.00 | 20-Oct-21 | 30-Jun-22 |
ActewAGL Distribution | Causeway to East Lake - 132/11kV necessary Relocation & Decommissioning of Causeway Switching Station | $1,456,570.50 | $1,456,570.50 | 12-Aug-21 | 11-Aug-23 |
MGF Project Management Pty Ltd | Construction Supervisory Consultancy for the Whitlam Display Village Collaboration Hub | $22,000.00 | $41,250.00 | 11-May-21 | 30-Apr-22 |
HIP V. HYPE Sustainability | Kingston Arts Precinct Sustainability Plan | $69,866.00 | $69,866.00 | 20-Apr-22 | 31-Jul-22 |
Colliers International | North Canberra land - valuation advice | $43,862.50 | $43,862.50 | 31-Mar-22 | 30-Jun-22 |
Hill Thalis Architecture + Urban Projects P/L | Whitlam Local centre - Place and Design Framework | $21,780.00 | $88,380.00 | 08-Feb-22 | 15-Dec-22 |
AECOM | Sustainable Civil Construction Project | $70,000.00 | $70,000.00 | 08-Apr-22 | 08-Jul-22 |
Michael Collins and Associates | Commercial Advisory Services | $77,000.00 | $77,000.00 | 27-Jun-22 | 31-Jan-23 |
AECOM Australia Pty Ltd | Sustainable Civil Construction Project | $70,000.00 | $70,000.00 | 25-Apr-22 | 05-Jul-22 |
Icon Water Limited | Riverview (West Belconnen) Project Management / Technical Advisory | $770,000.00 | $770,000.00 | 06-Jun-22 | 31-Mar-23 |
AECOM Australia Pty Ltd | Molonglo 132kVa Relocation Project - Construction Engineering Service Contract | $836,170.80 | $836,170.80 | 04-Apr-22 | 30-Jun-24 |
Cardno (NSW/ACT) Pty Ltd | LAWSON ROUNDABOUT - CONSTRUCTION MANAGEMENT AND SUPERINTENDENCY | $67,665.00 | $67,665.00 | 05-Aug-22 | 20-Dec-22 |
Bespoke Change | Provision of an Employee Survey Analysis and Services | $174,350.00 | $174,350.00 | 08-Jul-22 | 07-Jan-23 |
Hill Thalis Architecture + Urban Projects P/L | Urban Design and development advice | $80,850.00 | $80,850.00 | 06-Jun-22 | 31-Dec-22 |
Ainslie Urban Farm | Community Gardens for SLA Communities | $25,849.00 | $25,849.00 | 12-Apr-22 | 29-Jun-22 |
Websilk Pty Ltd | Redevelopment of the Suburban Land Agency website | $315,000.00 | $386,500.00 | 04-Oct-22 | 03-Oct-23 |
TOAC Services Pty Ltd | Ngunnawal Liaison Services | $90,000.00 | $90,000.00 | 26-Jul-22 | 26-Jul-23 |
The Trustee for Leeson Family Trust | KAP CMP Update | $35,640.00 | $48,423.37 | 15-Mar-22 | 15-Mar-23 |
PROPERTY WORKS PTY LTD | Building Inspection Services for Taylor & Whitlam Affordable Housing | $126,887.20 | $126,887.20 | 08-Aug-22 | 09-Feb-24 |
SMEC Australia | John Gorton Drive 3C enabling works design and documentation | $848,100.00 | $848,100.00 | 07-Oct-22 | 31-May-23 |
Curijo Pty Ltd | Ngunnawal Engagement Kingston Arts Precinct | $80,840.00 | $80,840.00 | 27-May-22 | 06-Mar-23 |
MinterEllison | West Belconnen Joint Venture – provision of legal services | $220,000.00 | $220,000.00 | 12-Jul-21 | 31-Mar-23 |
Place Laboratory PTY LTD ATF The Lab Unit Trust | Phillip Section 7 Place Design Brief | $190,426.50 | $190,426.50 | 30-Sep-22 | 28-Feb-23 |
Stuart Mackenzie Design | John Gorton Drive 3C Landscape and Architectural Design | $236,742.00 | $363,242.00 | 26-Sep-22 | 31-May-23 |
Judd Studio | SL2222425 | $71,500.00 | $71,500.00 | 25-Aug-22 | 24-Aug-23 |
PLACE Laboratory | SL2222464 | $92,752.00 | $92,752.00 | 19-Sep-22 | 18-Sep-23 |
LANTERRA CONSULTING PTY LTD | Detailed Site Inspection (DSI) report for Section 185 (block 4) Belconnen | $42,585.00 | $42,585.00 | 23-Nov-22 | 03-Feb-23 |
LANTERRA CONSULTING PTY LTD | Detailed site investigation (DSI) to assess the suitability of Section 23 Block 3, Belconnen from a site contamination perspective and complete a Geotechnical investigation of Section 23 Block 2 in Belconnen | $25,910.89 | $25,910.89 | 22-Nov-22 | 05-Feb-23 |
KPMG | Commercial Advisory 21-22 FY | $166,540.00 | $166,540.00 | 15-Mar-21 | 31-Aug-22 |
INDESCO PTY LIMITED | Taylor Edge Treatment Superintendency | $107,728.00 | $107,728.00 | 02-Feb-23 | 02-Feb-25 |
Indesco Pty Ltd | Taylor Local Centre Carpark Superintendency | $109,864.00 | $109,864.00 | 03-Feb-23 | 31-Dec-24 |
DPM Conferencing T/A Communication Link | Community and stakeholder engagement services - coombs Block 3, Section 17 | $28,823.30 | $28,823.30 | 19-Jan-23 | 19-Jul-23 |
JPS ENGINEERING CONSULTANTS PTY LTD | Block 8 Section 1 Symonston Site Investigation Report | $24,970.00 | $56,716.00 | 30-Jan-23 | 30-Jun-23 |
Tait Network | Whitlam Local Centre EDP | $54,725.00 | $72,828.00 | 29-Aug-22 | 23-Aug-23 |
The Expert Client Pty Ltd | Coombs and Wright Village - Lead consultant | $137,500.00 | $137,500.00 | 21-Apr-23 | 21-Oct-23 |
Arup | Carbon Positive Precincts | $115,231.00 | $115,231.00 | 09-May-23 | 09-Oct-23 |
Calibre Professional Services (ACT) Pty Ltd | Molonglo 3, 32kV Transmission Line Relocation - Detailed Civil Design Services | $293,097.11
| $676,138.34
| 18-Jul-19 | 19-Jan-22 |
R A Finlay | Ginnniderry Joint Venture - facilitation services | $49,500.00 | $49,500.00 | 26-Jul-22 | 30-Jun-23 |
The Communication Link | Coombs Play Space Stage 2 Engagement | $27,742.62 | $27,742.62 | 13-Aug-19 | 13-Jun-20 |
Atlas Urban Economics Pty Ltd | Financial Feasibility with Development Options Study | $194,698.00 | $194,698.00 | 17-Jan-22 | 17-Apr-22 |
Calibre Professional Services Pty Ltd | Whitlam 3 - Construction Services Engineering Consultancy PAD Under GC21 | $1,808,339.00
| $1,808,339.00
| 01-Mar-22 | 01-Jul-25 |
Calibre Professional Services | CSG Relocation | $39,971.00 | $39,971.00 | 05-Nov-21 | 20-Jun-22 |
Veris Australia Pty Ltd | Coombs and Wright Village - surveying services | $49,060.00 | $49,060.00 | 02-May-23 | 02-Nov-23 |
Note: this information has been taken from the ACT Government Contracts Register, and includes all SLA contracts posted to the Register as at 13 June 2023.